Singapore

260B Ang Mo Kio St 21

Project Photos

The Qanvast certified project located at Ang Mo Kio St 21, the HDB with 4 rooms designed with a modern & contemporary style. Modern and contemporary design is characterized by clean lines, minimalism, natural materials, and the nature of light.

Renovation Price: $50,000 SGD
Completion Time: 14 weeks
Design Style: Modern & Contemporary
Year of Project: 2022

WORKS INCLUDED

A LITTLE ABOUT PROJECT

PROJECT DETAILS

A marble built countertop placed in the center of the kitchen is used as a dining table which focuses on its functionality. The use of marble-feel kitchen cabinets and marble wall finishing make the area look elegant. Modern pendant lights are installed on top of the dining table with the big rounded mirror placed in front of the table which emphasizes on maximizing the natural lights. Fully covered transparent glass separating the wet and dry area in the bathroom has made the area looks spacious.

Share This Project

Facebook
Twitter
LinkedIn
Pinterest

Related Projects