HDB Renovation Permit Guide for Singapore Homeowners

Last reviewed: 9 September 2026
Written and reviewed by the Zenith Arc Design Team

Open-plan kitchen and dining axis in a 119 sqm HDB executive apartment in Woodlands, Completed HDB renovation interior by Zenith Arc in Singapore

Planning an HDB renovation involves more than choosing materials and finalising your layout. Before work begins, you must establish which parts of the proposed renovation require HDB approval, who will submit the application and whether licensed professionals are needed.

Not every renovation item requires an HDB permit. However, every item must still comply with the applicable HDB renovation guidelines. As the flat owner, you remain responsible for ensuring that the work is authorised and carried out correctly.

HDB renovation permit: the quick answer

  • Engage a contractor listed in HDB’s Directory of Renovation Contractors for renovation work in your flat.
  • Your renovation contractor submits the electronic permit application after you authorise them.
  • You must sign the acknowledgement form used for the application.
  • Work requiring approval must not begin until HDB grants the permit.
  • All partial or complete demolition and hacking of walls require prior written approval.
  • Some proposals require additional drawings or supervision from a Qualified Person.
  • Even work that does not require a permit must comply with HDB’s technical conditions.
  • Check your flat’s specific requirements because some precincts and flat designs have additional restrictions.


The official starting point is HDB’s Application for a Renovation Permit page.

Does my HDB renovation require a permit?

The answer depends on the exact work proposed, not simply whether the renovation is “major” or “minor”.

A cosmetic change may not require approval, while a seemingly small alteration involving a wall, window, electrical load or plumbing connection may be regulated. HDB publishes separate requirements for building, window, electrical, air-conditioning, water, sanitary plumbing and gas works.

Common HDB renovation works and permit requirements
Renovation workPermit positionWhat homeowners should know
Partial or complete demolition of wallsPrior HDB approval requiredDo not begin hacking or demolition until written approval has been granted.
Replacing or removing wall and floor finishesDepends on the work involvedYour HDB-registered renovation contractor should check the applicable HDB guideline and permit conditions before work begins.
Bathroom or toilet wall and floor finishes in a new flatRestricted during the first three yearsThe original finishes must not be removed during this period. Overlaying with adhesive may be allowed, subject to HDB’s conditions.
Window installation or replacementHDB requirements and approval applyEngage a BCA-approved window contractor and comply with the applicable window requirements.
Air-conditioning installationHDB installation requirements applyUse a BCA-trained air-conditioning installer and follow HDB’s installation conditions.
Electrical, gas or plumbing workTrade-specific requirements applyEngage the appropriate EMA-licensed electrical or gas worker, or PUB-licensed plumber, where required.
Minor works that do not require a permitNo permit for certain permitted worksHDB renovation rules still apply. Renovation work must be carried out by an HDB Directory of Renovation Contractors-listed contractor.

Use HDB’s current Renovation Guidelines to check each proposed item. Do not rely on a generic online list as approval for your specific flat.

Who applies for an HDB renovation permit?

For general renovation work, the flat owner authorises a contractor listed in the Directory of Renovation Contractors to submit the electronic application.

The contractor must attach an acknowledgement form signed by the owner. HDB sends the owner an SMS after receiving the submission.

For regulated specialist work, additional parties may be involved:

  • A PUB-licensed plumber for water service and sanitary work
  • An EMA-licensed gas service worker for gas work
  • An EMA-licensed electrical worker for electrical installations
  • A BCA-approved window contractor for window installation or replacement
  • A BCA-trained air-conditioner installer
  • A Qualified Person for specified structural or technical proposals


Being an interior designer, renovation contractor or specialist installer involves different responsibilities. Confirm which legal entity will submit the application and which professionals will carry out each regulated part of the work.

How to apply for an HDB renovation permit

1. Finalise the proposed scope

Prepare a clear list of the work planned for each room. Identify proposed wall changes, replacement of finishes, plumbing alterations, electrical work, windows, doors and air-conditioning installations.

Permit requirements cannot be checked accurately from an inspiration image alone. Your contractor needs the existing floor plan and sufficient technical details.

2. Verify the renovation contractor

Check that the contractor carrying out the renovation appears in HDB’s Directory of Renovation Contractors. This requirement applies even when the particular work does not need a permit.

3. Prepare the floor plan and supporting documents

HDB may need to evaluate proposals such as wall demolition. The renovation contractor must submit a floor plan showing the proposed work with the application.

If you no longer have the floor plan provided with the flat’s sales documents, HDB currently allows an owner to purchase a copy for S$5 through its residential floor-plan service or at an HDB Branch self-service kiosk.

Some proposals may require additional plans, calculations, certifications or approvals from a Qualified Person or another authority.

4. Sign the acknowledgement form

The owner signs the acknowledgement form authorising the contractor to apply and confirming the owner’s responsibilities.

5. Let the contractor submit the application

The contractor submits the renovation application electronically. Permit-dependent work must remain unscheduled until the necessary approval is granted.

6. Check the granted permit

Once granted, the owner can use HDB’s renovation permit service to view the permit.

Read the approved scope and conditions carefully. Approval for one item does not automatically authorise other alterations added later.

7. Notify neighbours before work starts

HDB requires the owner or contractor to give written notice at least five days before renovation begins to neighbours within the prescribed two-unit radius.

The Notice of Renovation must also be displayed outside the flat throughout the renovation period.

How long does an HDB renovation permit take?

HDB’s public application page does not promise one fixed processing time for every renovation proposal.

Processing depends on the type of work, whether the submitted information is complete and whether HDB or another authority must evaluate drawings or technical details. Proposals involving demolition, structural considerations or a Qualified Person may require additional review.

Do not confuse the application processing time with the period allowed to complete the renovation after the permit is granted.

HDB currently states these completion periods:

Difference between permit approval time and renovation completion periods
Stage or flat typeTime periodWhat it means
Permit application reviewNo single standard processing timeThe review time depends on the proposed work, supporting documents and whether plans or professional endorsements are required.
Newly completed HDB blockWithin 3 monthsThe approved renovation must be completed within three months from the date the permit is granted.
Existing HDB blockWithin 1 monthThe approved renovation must be completed within one month from the date the permit is granted.
Window works onlyWithin 2 weeksApproved window installation or replacement work must be completed within two weeks.

These are completion periods after a permit is granted, not guaranteed permit-approval times. More complex applications may require additional review or documentation.

Build a reasonable approval buffer into your renovation schedule. Do not promise a hacking date, arrange a major delivery or confirm a move-in date on the assumption that approval will arrive within a particular number of days.

What are the permitted HDB renovation hours?

HDB separates general renovation work from restricted work that creates heavier noise.

Permitted HDB renovation working hours
Type of workPermitted daysPermitted hoursRestrictions
General renovation workMonday to Saturday9:00am to 6:00pmNot permitted on Sundays or public holidays.
Noisy work, including hacking, demolition and removal of wall or floor finishesMonday to Friday9:00am to 5:00pmNot permitted on Saturdays, Sundays, public holidays or the eves of New Year’s Day, Chinese New Year, Hari Raya Puasa, Deepavali and Christmas Day.

No more than two HDB-approved handheld power tools may be used at the same time. Demolition of walls and removal of wall or floor finishes must be completed within three consecutive days.

Restricted work includes activities such as demolishing walls, removing wall or floor finishes, cutting tiles and heavy or excessive drilling.

It is not permitted on Saturdays, Sundays, public holidays or the eves of New Year’s Day, Chinese New Year, Deepavali, Hari Raya Puasa and Christmas Day.

At any given time, contractors may use no more than two HDB-approved handheld power tools or their equivalent. Demolition of walls and removal of wall or floor finishes must not take more than three consecutive days.

These conditions are published in HDB’s Important Information on Renovations. Check the current page again before scheduling noisy work because prevailing conditions may change.

How much does an HDB renovation permit cost?

HDB’s current homeowner permit page does not publish one general permit fee covering every type of renovation.

Separate expenses may arise from:

  • Purchasing a replacement floor plan
  • Engaging a Qualified Person
  • Licensed electrical, plumbing, gas or window professionals
  • Drawings, calculations or supporting documentation
  • Town Council haulage and debris-removal services
  • Other authority approvals required for specialised work


Ask for these items to be identified clearly in the renovation quotation. A quoted “permit charge” should explain what service or third-party cost it covers.

How do I check my HDB renovation permit?

HDB sends the owner an SMS after receiving the contractor’s electronic submission. Once the permit is granted, the owner may view it through HDB’s online renovation permit service.

If information appears to be missing or the application remains unresolved, first ask the submitting contractor to confirm:

  • The date of submission
  • The work included in the application
  • Whether the acknowledgement form was attached
  • Whether HDB requested further information
  • Whether another professional or authority must respond


Contact the HDB Branch managing the flat if the contractor cannot resolve an HDB-specific issue.

Special considerations for newly completed flats

Before HDB can grant a renovation permit for a new flat, the owner must have opened a water and electricity utilities account.

Newly completed flats also have a three-year restriction on removing the bathroom and toilet wall and floor finishes provided by HDB or the developer. The restriction protects the waterproofing system.

During this period, owners may lay new toilet floor finishes over the existing finish with adhesive, subject to HDB’s conditions. Do not hack the original bathroom finishes without confirming that the restriction has ended and that the proposed method is allowed.

If your flat has a special design or belongs to a precinct such as a DBSS development, check MyHDB Page for additional conditions applying to that specific flat.

HDB renovation permit checklist for homeowners

Before renovation starts, confirm that:

  • The contractor carrying out the renovation is listed in the DRC
  • Every proposed item has been checked against the correct HDB guideline
  • Wall demolition or hacking has written approval
  • The floor plan and supporting documents match the proposed work
  • The acknowledgement form has been signed
  • Required licensed workers and Qualified Persons have been identified
  • Permit-dependent work will only begin after approval
  • The approved scope matches the final design
  • Neighbours will receive the required advance notice
  • The Notice of Renovation will be displayed outside the flat
  • General and noisy-work schedules comply with HDB timings
  • The renovation programme fits within the permitted completion period
  • Debris removal has been arranged correctly


Keep the approved permit, final plans and important correspondence available throughout the project.

Frequently asked questions

Do all HDB renovation works require a permit?

No. Some works require prior approval while others do not. However, work that does not require a permit must still comply with HDB’s guidelines and technical conditions.

Can an HDB owner apply for the renovation permit personally?

For general renovation, the flat owner authorises an HDB-registered renovation contractor listed in the Directory of Renovation Contractors to submit the electronic application. Electrical, gas, plumbing, window and air-conditioning works must also be handled by the relevant licensed, approved or trained specialist where required.

Can renovation begin while the permit application is pending?

Work requiring a permit must not begin until HDB grants the necessary approval. Starting early can result in the work being treated as unauthorised.

How long does HDB permit approval take?

There is no single published processing period covering every proposal. Timing depends on the scope, submitted documents and whether technical evaluation or additional professional input is required.

What time can HDB renovation work start?

General renovation may take place from 9:00am to 6:00pm on weekdays and Saturdays. Restricted noisy work is limited to 9:00am to 5:00pm on weekdays.

Can HDB renovation work be carried out on Saturday?

General renovation is permitted on Saturdays that are not public holidays, between 9:00am and 6:00pm. Restricted noisy work such as wall demolition, removal of wall or floor finishes and tile cutting is not allowed on Saturdays.

How can neighbours tell whether a flat has renovation approval?

The owner and contractor must display a Notice of Renovation outside the flat after the permit is obtained and throughout the work. Anyone concerned about suspected unauthorised work should contact the HDB Branch managing the block.

Is there an HDB renovation permit fee?

HDB’s current homeowner application page does not state one standard permit fee for every renovation. Related costs may arise from floor plans, specialist professionals, documentation and debris-removal services.

What happens if renovation work breaches HDB requirements?

HDB can require unauthorised work to stop, be corrected or removed, and the flat may need to be reinstated. Breaches can also expose the responsible parties to enforcement action.

Planning an HDB renovation?

Permit planning should happen while the layout and scope are being developed, not after the quotation is signed and the work schedule is fixed.

Bring your floor plan, preferred layout, key-collection or move-in date and list of proposed works to the consultation. The Zenith Arc Design Team can help you understand the renovation sequence, identify likely approval dependencies and prepare a clearer project scope.

Explore our HDB renovation services or contact the Zenith Arc Design Team to discuss your flat.

HDB remains the final authority on whether a specific renovation proposal is permitted and what conditions apply.