The short answer: before you sign for a condo renovation, read your MCST’s renovation rules, see your actual materials in person, and get a quote with every item and finish named. Condo works are slower than HDB ones because of restricted hours and approvals, so plan for that from the start.
Every condo sets its own renovation rules. Most require approval before works start and a refundable renovation deposit, which renovation guides put anywhere from about S$500 to S$10,000. Breaking the rules, such as working outside permitted hours or damaging common areas, can mean fines that come out of that deposit.
Working hours are usually limited to weekdays and part of Saturday, with no works on Sundays or public holidays. Approval itself can take a few weeks. That’s why a condo renovation usually takes longer than an HDB one of the same size.
Poor workmanship was the largest single category of renovation complaints to CASE in the first half of 2026, at 27.1%. In a condo, where you’re paying for the finish, it shows in the details: edges that don’t meet, laminate that lifts, uneven grout lines.
A 3D render can make any laminate look like marble. Seeing the real materials before you sign is the simplest way to avoid regretting the finish.
Qanvast’s 2026 estimates put a resale condo renovation at roughly S$78,280 to S$105,000, and a new condo at roughly S$44,290 to S$62,160. Resale units cost more because owners usually replace dated kitchens, bathrooms and built-ins.
We plan the works around your MCST’s rules before we start and go through the approval forms with you. You can see and touch every finish at our INSPACE showroom, and every material is named in your itemised quotation. Your deposit is 100% protected, we hold back 5–10% of our own final payment until handover is done properly, and the warranty runs for at least 3 years.
See a finished example: a 3-bedroom condo at 151 Cavenagh Road.
“In a condo, the rules decide your schedule and the finishes decide whether you’re happy with it. Sort both out before you sign,” says Jordan Toh, Founder of Zenith Arc.
Usually, yes. Most MCSTs need you to submit an approval form and pay a renovation deposit before works start. Check your own condo’s by-laws.
It depends on scope, but restricted working hours and MCST approval usually make it longer than an HDB renovation of a similar size.
Qanvast’s 2026 estimates put it at around S$78,280 to S$105,000.
Each MCST sets its own hours. Most allow works on weekdays and part of Saturday, with no works on Sundays or public holidays.
Sources: Qanvast 2026 condo renovation cost guide; CASE complaint data, first half of 2026; MCST renovation guides.