The short answer: the first decision for any landed renovation is whether to do additions and alterations (A&A) or rebuild. A&A keeps most of your house and costs less; a rebuild gives more freedom but takes longer. Both need a Qualified Person (QP) for the approvals. Settle that question, the budget and where you’ll live during the works before anything else.
A&A changes the existing house: new layouts, extensions, upgraded finishes. A rebuild knocks the house down and starts again. If your plans change too much of the existing structure, the authorities may treat them as a rebuild, with different rules, costs and timelines. Your QP can tell you which side of that line your plans fall on.
Sometimes the honest answer is that you don’t need to rebuild. A well-planned A&A can give a family most of what they want for far less time and money.
Structural works on landed homes need approval, and the QP prepares and makes the submissions on your behalf. Industry estimates put approvals at roughly 6 to 12 weeks for A&A and 12 to 24 weeks for a rebuild. Whole projects often run 12 to 18 months for A&A and 18 to 28 months for a rebuild.
That makes interim housing a real cost. Plan where you’ll live, and for how long, before you sign.
Renovation guides put A&A at roughly S$250 to S$800 per square foot and a rebuild at roughly S$600 to S$1,000 or more per square foot. The gap depends on what you’re changing and the condition of the existing structure.
HDB has a scheme that helps with grab bars and ramps for older residents. Private homes don’t. If parents will live with you, or you plan to stay for good, it costs less to allow for a lift, wider doorways or a ground-floor bedroom now than to renovate twice.
One team handles design and build from start to handover. We work alongside your QP and keep everyone on one schedule. Every line in your quotation is itemised. We hold back 5–10% of our own final payment until handover is done properly, the warranty runs for at least 3 years, and our S$1M Project Reserve refunds the work not done if we leave it unfinished or run more than 30 days late, up to S$150,000 per project.
Read more in our landed house renovation guide, or see a finished home at Pasir Ris Heights.
“A landed project can run for a year or more. Know which route you’re taking, and what protects you, before the first wall comes down,” says Jordan Toh, Founder of Zenith Arc.
Usually, yes. Renovation guides put A&A at roughly S$250 to S$800 per square foot and a rebuild at S$600 to S$1,000 or more.
For structural works, yes. The QP is the architect or engineer who makes the submissions on your behalf.
Industry estimates put A&A at around 12 to 18 months and a rebuild at around 18 to 28 months, including approvals.
Most owners rent nearby or move in with family. Budget for a year or more for a rebuild.
Sources: landed renovation guides from Singapore architects and builders; HDB EASE programme; Zenith Arc project experience.